LEGO Jumper Plate 2X4 with 2 Knobs

ID: 26798
Free

3D Model Details

  • Texture: No
  • Multipart model: No
  • File format: stl
  • File size: 1.3 MB
  • Upload date: 09/07/2025
  • Last update: 09/07/2025
Description
This is a LEGO Jumper Plate 2X4 with 2 Knobs (3 plates = brick). The plate is similar to the plate 6315024, but it does not need to be white.
Tags
Report this design

More models from vlad_marius

More from category Toys & Hobby

volcano neagw

$1.00

Giant crystal cave neagw

$1.00

palms and chairs neagw

$1.00

Bilionaire Mansion neagw

$1.00

mystic ice dragon neagw

$1.00

Arctic wolf neagw

$1.00

Bison neagw

$1.00

Unicorn neagw

$1.00